 |
|
Expand All | Contract All
|
|
|
|
|
 |
 |
Design Automation Associates, Inc. 68 Bridge Street, Suite 300 Suffield, CT 06078 USA Phone: 860-749-3832 FAX: 860-749-3842
Copyright © 1998-2008. All Rights Reserved.
|
|
 |
|
DTO Pro™
 |
Step 4: Proposal |
| |
Once the project requirements are defined, a no-cost DAA proposal is generated. The Proposal document includes:
- Cost & Savings Summary
- ROI Analysis
- Cost Estimate Summary (Entire System Implementation)
- Detailed Cost Breakdown
- Functional Specification Cost
- Estimated Schedule
- Required Resources
- Terms & Conditions
See a Sample Proposal.
|
| |
|
|
|
|
 |
"A complete custom bearing design and bill of manufacture is produced in 2 minutes!"
- R. Schroeder, CEO, Pacific Bearing Company
|
|
 |
 |
 |
|